E-Power Pipe® – Pioneering technology for the energy transition
Heitkamp Construction Swiss GmbH is the first company worldwide to procure its own E-Power Pipe® system, setting new standards in trenchless pipe laying.
Heitkamp Energy Infra GmbH
Through our subsidiary Heitkamp Energy Infra GmbH, we will carry out several drillings for high-voltage cables along the Hanover–Würzburg route, thereby making an important contribution to the construction of high-voltage transmission grids in Germany.

Advantages of the E-Power Pipe® method
- Minimal space requirements – no wide trenches or trenches necessary
- Maximum precision – even over long distances and in challenging geological conditions
- Fast implementation – highly efficient construction method over longer distances
- Sustainability – minimal impact on nature and the environment, low CO2 emissions
- Economic efficiency – lower costs compared to other trenchless methods for comparable projects
Sustainability – Environmentally friendly construction for the future
Ecological advantages: 90% less earthworks → protection of flora and fauna
Economic advantages: 45% less building materials → lower costs thanks to optimized cable spacing
Social advantages: 75% less land used → less disruption to inhabited and used areas
You can find more exciting information about the advantages of this process in the following Sheet.
Our process is particularly suitable for energy suppliers and network operators who want to expand their infrastructure in an environmentally friendly way and are looking for alternatives to trenchless construction methods.