Los 3

Los 3

In Lot 3, Heitkamp Energy Infra GmbH will take over the construction of four parallel trenchless boreholes using the E-Power Pipe® method for ARGE Tiefbau SuedLink Lot 3 (Habau / Bickhardt Bau / PPS). Each borehole measures 950 meters, resulting in a total drilling distance of 3,800 meters.
The work is scheduled to take place between fall 2025 and spring 2026.