Los 3
Heitkamp Energy Infra GmbH has been commissioned by ARGE SL Lot 3, consisting of Habau Deutschland GmbH, PPS Pipeline Systems GmbH, and Bickhardt Bau SE, to construct a total of 3,800 meters of cable conduits without excavation.
The work is scheduled to take place between fall 2025 and spring 2026.